Item Coversheet


Item Title:
LOAN ORDER - ELIZABETH BROOKS SCHOOL - DESIGN/FEASIBILITY STUDY

Item Detail:

14.     LOAN ORDER, appropriating $100,000.00 to pay costs of a schematic design/feasibility study as required by the Massachusetts School Building Authority with respect to the proposed accelerated repairs to the Elizabeth Brooks School. (Passed to a Second Reading - June 8, 2017.)



Additional Information:
ATTACHMENTS:
DescriptionType
LOAN ORDERCover Memo